Tabaqaطبقة Send us a broken part

Spare parts, printed in days.

قطع الغيار، تُطبع في أيام

Tabaqa scans a broken part, prints it in metal layer by layer in Dubai Industrial City and sends it back tested.

Send us a broken part
A metal turbine part, printed layer by layer
Printed in metalDubai Industrial City

Day 0

Twelve weeks is too long.

اثنا عشر أسبوعاً مدة طويلة

A feeder ship at Khalifa Port loses its seawater cooling pump. The maker can send a new impeller in twelve weeks. Every day at the berth costs the owner.

Day 1, scan

Scan the broken one.

امسح القطعة المكسورة

We scan what is left of the impeller, rebuild the missing vanes and check the model against the pump maker's drawing.

A technician measuring a part for scanning

Day 2, print

1,850 layers overnight.

1850 طبقة في ليلة

A laser melts marine-grade stainless steel powder 40 microns at a time.

A laser at work on a metal part
An engineer inspecting a finished metal part

Days 3 and 4, test and fit

Fitted on day four.

مركّبة في اليوم الرابع

Heat treatment, a CT scan for hidden voids, a balance test, then the road to Abu Dhabi.

4daysTabaqa
12weeksNew from the maker

Send us a broken part.

أرسل لنا القطعة المكسورة Send us a broken part