Walk the site once.
Record one 360 walk on your phone. Sitewalk matches every frame to the plans, shows progress per room, and flags delays and quality issues for your site manager to confirm.
From an 18 minute walk to a checked issue list.
Friday 6 November, level 3, 07:40 to 07:58. Scroll through the walk and watch it turn into progress per room and one issue worth stopping for.

The kitAny 360 camera on a pole, and the phone you already carry.
Clip a 360 camera to a pole and walk the floor as you normally would. Sitewalk traces your path on the plan, with no markers and no scanner.
The whole block, after every walk.
Each walk updates every level and trade, so a slow services crew shows up before it holds up the boarders. Block B is 58% done against 63% planned.
Level 4 · MEP rough-in 58% · plan 80%
4days
behind plan on Block B, most of it on level 4, where ducts are not yet run in units 4.03 to 4.06.
Level 3 · 64% · plan 70%
1issue
to confirm on level 3: a fire damper missing at grid C-4, found two days before the wall is boarded.
Level 2 · finishes 92% · plan 90%
92%
of finishes done on level 2, two days ahead of plan, with all 14 rooms walked.
Nothing reaches a subcontractor until your site manager confirms it.
Fri 6 Nov, 08:02Mara L. confirmed the C-4 damper and sent it to Northline Air.
- 01
She confirms, edits or rejects
Sitewalk drafts each issue with a photo, a grid line and a trade. The site manager decides what goes out, and every decision is logged with her name.
- 02
Faces are blurred on the phone
Faces and number plates are blurred before the video leaves the phone. Your footage is never used to train shared models.
- 03
Every number shows its frames
Tap any percentage to see the frames behind it. Rooms the model is unsure of are marked needs a look, never rounded up.

Northline Air · Fri 6 Nov, 11:40Kwame A.: Damper fitted at C-4, photo attached. The wall is clear for the boarders on Tuesday.
It sees what the camera sees.
Work inside closed walls, under screed or above a finished ceiling cannot be measured from video. Sitewalk marks those rooms covered, check before close-up, and reminds you to walk before the boards go up.
“We caught a missing fire damper on level 3 a day before the boarders closed the wall. That one walk paid for the year.”
Tomasz R., site manager on a six storey residential buildWalk as often as you like.
A project counts as active when it has a walk in the last 30 days. Every plan starts with 14 days free on one project, every feature included.
| Plan | Projects | Seats | Adds | Per month |
|---|---|---|---|---|
| StarterOne build or one refit | 1 active project | 3 seats | Weekly PDF report | $149billed monthly |
| GrowthBuilders running a few sites | Up to 5 active projects | 15 seats | Issue routing, schedule import, owner reports | $390billed monthly |
| ScaleDevelopers and portfolios | Up to 15, then $59 each | Unlimited | BIM matching, single sign-on, API | $890billed monthly |

Block B · 6 levels · 58% done
Your next walk is Friday at 07:40.
Fourteen days free on one project, every feature included. Bring a 360 camera on a pole, or walk with the phone alone.