Walk the site once.

Record one 360 walk on your phone. Sitewalk matches every frame to the plans, shows progress per room, and flags delays and quality issues for your site manager to confirm.

01 to 04One walk, read the way Sitewalk reads itHarbour Row, Block B, level 3

From an 18 minute walk to a checked issue list.

Friday 6 November, level 3, 07:40 to 07:58. Scroll through the walk and watch it turn into progress per room and one issue worth stopping for.

Clip a 360 camera to a pole and walk the floor as you normally would. Sitewalk traces your path on the plan, with no markers and no scanner.

Block BSix levels, 112 rooms, walk 14 of 22

The whole block, after every walk.

Each walk updates every level and trade, so a slow services crew shows up before it holds up the boarders. Block B is 58% done against 63% planned.

Level 4 · MEP rough-in 58% · plan 80%

4days

behind plan on Block B, most of it on level 4, where ducts are not yet run in units 4.03 to 4.06.

Level 3 · 64% · plan 70%

1issue

to confirm on level 3: a fire damper missing at grid C-4, found two days before the wall is boarded.

Level 2 · finishes 92% · plan 90%

92%

of finishes done on level 2, two days ahead of plan, with all 14 rooms walked.

People decideEvery issue carries the name of the person who confirmed itAudit log on every walk

Nothing reaches a subcontractor until your site manager confirms it.

A site manager in a hard hat and safety vest reads an issue on her tablet among the props of an unfinished floor

Fri 6 Nov, 08:02Mara L. confirmed the C-4 damper and sent it to Northline Air.

  1. 01

    She confirms, edits or rejects

    Sitewalk drafts each issue with a photo, a grid line and a trade. The site manager decides what goes out, and every decision is logged with her name.

  2. 02

    Faces are blurred on the phone

    Faces and number plates are blurred before the video leaves the phone. Your footage is never used to train shared models.

  3. 03

    Every number shows its frames

    Tap any percentage to see the frames behind it. Rooms the model is unsure of are marked needs a look, never rounded up.

  4. Northline Air · Fri 6 Nov, 11:40Kwame A.: Damper fitted at C-4, photo attached. The wall is clear for the boarders on Tuesday.

The honest limitVideo measures only what is in viewCovered rooms are flagged

It sees what the camera sees.

Work inside closed walls, under screed or above a finished ceiling cannot be measured from video. Sitewalk marks those rooms covered, check before close-up, and reminds you to walk before the boards go up.

Faces blurred on deviceVideo kept 24 monthsExport or delete any time
Open ceiling services on an unfinished floor: steel trusses, galvanised ducts and red sprinkler pipes
“We caught a missing fire damper on level 3 a day before the boarders closed the wall. That one walk paid for the year.”
Tomasz R., site manager on a six storey residential build
PricingPriced by active project, not by seat

Walk as often as you like.

A project counts as active when it has a walk in the last 30 days. Every plan starts with 14 days free on one project, every feature included.

Sitewalk plans and monthly prices
PlanProjectsSeatsAddsPer month
StarterOne build or one refit1 active project3 seatsWeekly PDF report$149billed monthly
GrowthBuilders running a few sitesUp to 5 active projects15 seatsIssue routing, schedule import, owner reports$390billed monthly
ScaleDevelopers and portfoliosUp to 15, then $59 eachUnlimitedBIM matching, single sign-on, API$890billed monthly
Rolled and flat construction drawings with a laser measure on a site table
SetupUpload the PDF sheets or the BIM model you already have. Aligning a level takes about 20 minutes, and most teams read their first report the same day.

Block B · 6 levels · 58% done

Your next walk is Friday at 07:40.