Pump call-out
KSh 6,500 a visit
Within 48 hours in Machakos and Makueni, 72 hours further out. Parts at cost.
Machakos, Makueni, Kitui and Kajiado
Kina surveys, drills and solar-powers boreholes across Ukambani and Kajiado. Drop a pin and a photo of the ground: you get the likely depth, a costed plan and a survey you can book from your phone.
A rig costs the same to bring to your plot whether it finds water at 60 metres or not at all. So we start with the ground, not the invoice.
212
sites surveyed in 2025
31
owners we told not to drill, and saved the rig fee
9 in 10
boreholes at or above the yield we quoted
The site check compares your spot with 1,900 Kina drilling logs and reads the colour of your soil, right here on your phone. It stays light enough for a slow connection.
Your borehole log appears here
Pick a spot on the map or a town from the list. A photo and a line about how you use water make the answer sharper.
A hydrogeologist walks the plot with a resistivity meter and marks the spot. If the reading says don't drill, we tell you, and the survey is all you pay.
We file with the Water Resources Authority and NEMA, chase the approval and send it to your phone.
Rig, uPVC casing, gravel pack and development. The rig lead posts the depth and what the cuttings show every evening.
A 24 hour test pump measures the real yield. Then we size the solar pump, panels and tank to that number, not to a guess.
Every payment is tied to a depth the crew has reached and posted to you. We send a prompt to your phone and you approve it with your mobile money PIN, on your own phone, never on a website.
Drag, or use the arrow keys. Most of Machakos sits between 100 and 140 m.
Before the pumpKSh 1,210,000
Solar pump, panels and a 5,000 litre tank: KSh 395,000
One payment of KSh 395,000 at handover
We bought water by the bowser every week in the dry months. Kina said 84 metres and they struck at 81. Now the pump runs on sun and the dairy has 3,000 litres by noon.
We service solar pumps we installed and ones we didn't. Most stoppages are a controller, a loose cable or a dry run sensor, and most are fixed on the first visit.
KSh 6,500 a visit
Within 48 hours in Machakos and Makueni, 72 hours further out. Parts at cost.
KSh 18,000 a year
Two visits: panel clean, controller check and a yield test. Call-outs are free on the plan.
Five short steps. Book the survey with a KSh 45,000 deposit by mobile money; it comes off nothing else, and if we say don't drill, it's the only thing you pay.
If the survey says the spot is poor, we tell you before any rig moves and you pay only the KSh 45,000 survey. If we drill on a good reading and the hole is dry, you pay drilling to the depth reached and not the casing or the pump.
Yes. Every borehole in Kenya needs a Water Resources Authority permit and a NEMA licence. We file both as part of the survey and send you copies.
Drilling is paid in four stages as the rig goes deeper. The solar pump can be spread over 6 or 12 months with a flat 7.5 percent fee, paid by mobile money on the same date each month.
Yes. The whole page is about 700 KB. Turn on Data saver at the top and it drops to under 100 KB: no photos, no motion, every form still works.